Verifications

User Guide › Verifications

Each credited control must be verified, by its team, for each RF segment and beam destination it participates in. The Verifications tab shows where things stand, and is where teams record their checks.

The Verifications tab

The tab has three panels, each of which can be collapsed:

  • Credited Controls: each control, with a section per facility listing its RF segments and beam destinations with their status icons. The arrow (→) opens the control's page for that facility.
  • RF Segments: each segment, with its facility, its status and its earliest control expiration. The arrow opens the segment's page.
  • Beam Destinations: the same for each destination.

Filter narrows the tab to one facility, one verification team, or both. Expiring, at the top right, lists every verification that expires within seven days, by facility.

The icons are those of the verification status: a green thumbs-up for Verified, a yellow triangle for Provisionally Verified, a red X for Not Verified.

A control's page

A control's page (Control Verification) lists the control's verifications in two panels, RF Operations and Beam Operations, one row per segment or destination. Filter picks the control (listed as team / control) and, optionally, one facility. Info shows the control's description, documents, team and verification frequency.

Column Shows
Facility / RF Segment or Facility / Beam Destination Where the control applies.
Verified The status icon, the verification date and who verified it.
Expiration Date When the verification ends.
Components The components the verification covers, each with its status in SRM and a link to it there.
Comments The verifier's comments, and a Documentation link if one was given.
Audit History: every change to this verification.

Work on one control at a time from here: it lists exactly the rows your team is responsible for.

A segment's or destination's page

A segment's or destination's page lists the verification of each control that participates in it, as team / control, with the same columns. Its title shows its overall status and earliest expiration. Choose another segment or destination from the list at the top. The same view opens in a dialog when you select a segment or destination on the Authorizations tab.

Verifying a control

You can edit a verification if you have the directory role of the control's verification team (Inventory › Verifiers), or are an administrator. Log in first.

  1. Open the control's page (or a segment's or destination's page).
  2. Select the rows you checked. Hold down Ctrl or Shift (⌘ on a Mac) to select several, or use Select › All. Rows of several segments or destinations can be edited together, as long as they are your team's.
  3. Select Edit Verification. The dialog lists the rows you selected, and notes when their current values differ.
  4. Fill in:
  5. Status: Verified or Not Verified.
  6. Verification Date: when it was checked; Now fills in the current time.
  7. Verified By: who checked it; Me fills in your username.
  8. Expiration Date: when it must be checked again, normally from the control's verification frequency. Required for Verified, and it can't be in the past. Not Verified clears it.
  9. Comments, and a Documentation URL, such as a checklist or work record.
  10. Select Save. The same values are saved to every selected row.

Every save is kept in the row's History. The dialog doesn't offer Provisionally Verified.

Downgrading a control

Saving a lower status than a row had, such as Not Verified for a Verified row, is a downgrade. A downgrade revokes the director's permission at once: JAM sets each affected segment to high power RF No, and each affected destination to beam mode None, with a comment naming the control. It saves that as a new authorization, posts a log entry, and emails the facility's watchers, the administrators and manager, and the control's team. See Expirations and notifications.

Downgrade a control as soon as it can no longer be relied on; don't wait for its expiration.

Verifying a control again doesn't restore permission: the facility's authorizer must authorize it again.

Components

A verification can list the components it covers, such as the PSS devices of a segment. The components come from SRM, and their status icons show SRM's status: a component that isn't Ready in SRM may need the control checked again. The components are for information; they don't change the verification's status.

Administrators add or remove components: select one row, then Edit Components, search for a component by name and Add it, or pick one and Remove it.

Verification history

History in a row's Audit column lists every change to that verification, the newest first, ten per page: when it was modified and by whom, the verification date, who verified it, the status, comments and expiration. When a verification expires, JAM adds a row modified by jam-admin, with Not Verified and the comment "Expired".