Skip to content

Cross-checks

User Guide › Cross-checks

The Crew Chief and the halls measure different things, so their figures can't simply be compared. The Crew Chief timesheet compares them roughly, and also compares its figures with DTM's downtime. A failed cross-check is a prompt to look again and talk to the hall, not an error: the timesheet can still be saved and signed, with a comment explaining it.

Comparing the two perspectives

Crew Chief Hall
Monitors the beam type: CW (Up) or pulsed (Tune). Doesn't distinguish.
Is concerned mostly with whether beam is present. Also considers the target, data acquisition and beam quality.

Roughly:

  • ABU + BANU corresponds to Up + Tune + BNR.
  • BANU is at least BNR: the Crew Chief's BNR is part of the hall's BANU.
  • BNA corresponds to Down.
  • The hall's Off corresponds to the Crew Chief's Off.

They don't match exactly. A hall can reject beam for its quality, so ABU + BANU can be less than Up + Tune + BNR and BNA more than Down. Crew Chiefs used to record BANU themselves, but couldn't tell whether the hall was really using the beam, so they now record BNR. Hall B, for example, can switch from ABU to BANU without stopping the beam or telling MCC: at low current it can turn off its data acquisition for housekeeping while beam still runs.

What is compared

The Crew Chief's side uses the timesheet's reported values, with the measured values for hours not yet saved. The hall's side uses only the hall's saved hours in the Crew Chief's shift: the last hour of its previous shift and all but the last hour of its current one. An unsaved hall hour counts as zero, so ask the halls to save those hours first (see What the Crew Chief needs from the halls).

Most checks allow 10 minutes' slack, so that a few minutes' difference in how the figures were recorded doesn't fail them.

The cross-check panel

The panel on the Crew Chief timesheet has three tabs.

Shift Summary

BTM vs DTM compares the timesheet with DTM's downtime in the shift:

Figure Meaning
BTM PHYSICS, INTERNAL DOWN From the timesheet.
DTM BLOCKED DTM's CEBAF Blocked downtime (linked to DTM).
DTM TUNING DTM's CEBAF Tuning downtime (linked to DTM).
PHYSICS DOWN Computed: BLOCKED − INTERNAL DOWN.
RESEARCH Computed: PHYSICS − TUNING − PHYSICS DOWN.

and checks:

Check Passes when
Low Program Check PHYSICS + INTERNAL DOWN ≥ BLOCKED − 10 min: DTM doesn't have the machine down for longer than BTM had it scheduled to run.
High Tuning Check PHYSICS ≥ TUNING − 10 min.

Hall Time Accounting has a row for each hall:

  • CC Shift Hours Status: whether the hall's hours needed for this shift are saved (the Experimenter cell links to the hall's timesheet), and whether the Crew Chief's are.
  • The hall's ABU, BANU, BNA and OFF, and the Crew Chief's UP, TUNE, BNR, DOWN and OFF for it.
  • Cross Check Status: ✔ if all of the hall's checks below pass, X if any fails. Select an X to see why.

Crew Chief Comments explain discrepancies; signing a timesheet whose cross-checks fail requires one. Reviewer Comments are for administrators reviewing the timesheet later; a Crew Chief can open them for editing, but only an administrator can save them.

The panel shows when it was calculated; Reload recalculates it, such as after a hall saved its hours.

Details

The shift's checks for each hall, with a message for each that fails:

Check Passes when
Beam Mode: Low Physics / High UP + TUNE + BNR + DOWN The hall's UP + TUNE + BNR + DOWN ≤ the accelerator's PHYSICS + 10 min.
Accelerator: High ABU / Low PHYSICS + RESTORE + STUDIES ABU ≤ PHYSICS + NPES RESTORE + STUDIES + 10 min.
Accelerator: High BANU / Low PHYSICS BANU ≤ PHYSICS + 10 min.
Accelerator: High BNA / Low PHYSICS BNA ≤ PHYSICS + 10 min.
Hall: High ABU / Low UP (ABU + BANU) / 2 ≤ UP + TUNE + BNR, or UP ≤ 30 min: the hall didn't use much more beam than it got.
Hall: Low ABU / High UP ABU + BANU ≥ (UP + TUNE + BNR) / 2, or UP ≤ 30 min: the hall didn't use much less beam than it got.
Hall: Low BANU BANU + 10 min ≥ BNR.
Hall: High BNA / Low DOWN + UP + TUNE BNA ≤ DOWN + UP + TUNE + 10 min.
Hall: High EXP OFF / Low OPS OFF The hall's OFF ≤ the Crew Chief's OFF + 10 min.
Multiplicity: High UP / Low ANY UP The hall's UP ≤ ANY UP + 10 min.

The first two hall checks are skipped when the hall had no more than half an hour of UP. The tooltips of some checks describe them more loosely than this table; the table is what BTM calculates.

Hourly

The same checks hour by hour, with each failure's message in minutes and prefixed by its hour, and a BTM vs DTM downtime check for each hour. Use it to find the hour a shift-level discrepancy comes from.

Resolving a discrepancy

  1. Check that the hall has saved the hours the Crew Chief's shift needs (CC Shift Hours Status).
  2. Find the hour on the Hourly tab, and compare it with what happened.
  3. Correct whichever side is wrong. For example, during a Møller measurement the hall may record more ABU than the Crew Chief's Up and Tune; raise Up or Tune to match. See Common issues.
  4. If the difference is real, explain it in Crew Chief Comments before signing.